Panama Canal Mooring Equipment Retrofit
With the navigation of the new Panama Canal, some large-scale ships can also pass through the Panama Canal.
According to the requirements of the Panama Canal authorities, these ships need to modify the mooring system to meet the requirements of navigation of the canal.
To fulfill the requirement of ACP, usually check \bitt\Pilot ladder\awning are to be provide, If the above equipment is already equipped on board, only the parts that do not meet ACP requirements need to be retrofit.
Drawing to updated :
1、Mooring arrangement
2、Structural drawing of Reinforce
3、Strength calculation report